What constitutes decoration?

尊龙新版官网网页版Dafeng store 113

You can understand that when the decoration is completed and the house is inverted, the basic thing that can fall off is soft decoration, such as furniture, curtains, sofas, carpets, etc.

What is hardcover?

Some netizens should say that the house must be upside down, and what falls off is soft, so what can't fall off is hard, that's right, that's it. Hard decoration includes wall reconstruction, ceiling, laying of line pipe, coating, etc.

When it comes to hard installation, it is necessary for us to decompose the hard installation. The construction steps during this period are divided into five points: Commencement disclosure, water and electricity, mud wood, paint and completion acceptance.

Commencement disclosure

Let's talk about the commencement disclosure first. As the first step after signing the contract, the disclosure makes us have to work hard. At the time of disclosure, decoration users, designers, construction team leaders and third-party supervisors are indispensable. At the time of disclosure, we must keep in mind that we should try our best to explore the problems existing on the site, and record these problems and conceivable construction processes in written form, which is the construction requirements of the construction team in the future and has legal effect. Here, I have to remind you that you must be careful when signing the contract.

We once met such a netizen. During the disclosure, because it was the old house, we planned to add a layer of composite floor to the original floor on the floor of the living room. However, after dismantling the old, we found that some places on the floor where cabinets have been made have not been paved. If the floor is repaired, it is impossible. If it is leveled with cement, it will be impossible to deal with the junction with the original floor and can only be completely demolished, but because it is an old house, The floor is used, and the cement leveling is used. It is worried that the water seepage will affect the downstairs, and a waterproof treatment is added. The insufficient early inspection of this ground leads to two expenses in the later stage: ground leveling and waterproof treatment. Do you think it is unjust!

Hydropower transformation

After the disclosure, there is water and electricity. Water and electricity mainly includes water and electricity direction arrangement, wall and ground slotting, wiring, pipeline arrangement, strong and weak current installation. You should know that during water and electricity acceptance, slotting can be measured by yourself, including junction boxes. However, we may ignore some problems in the early stage, such as the calculation method of slotting and how to calculate if more than two pipes are arranged in the trunking. These are also what we need to consider.

Mud wood engineering

In the mud wood, the laying of ceramic tiles perfectly reflects the value of beautiful decoration. As for the sequence of brickwork and carpentry, we should do it according to our actual situation. The brickwork is mainly to reconstruct the wall, brush waterproof paint, lay ceramic tiles and floor tiles, while the carpentry is to carry out the construction of wood products such as wooden keel and partition, as well as various modeling ceiling or background wall that we like very much now, It's all the work of carpenters. Some netizens may also like to let carpenters do some cabinets and furniture. It needs to be reminded here. Because carpentry is on-site construction, there are restrictions on the environment and tools, and it can't be more accurate and beautiful with the merchant's machine production. We want to remind you that it is decided according to their own needs.

Painting stage

In the painting stage, we mainly deal with the wall, make the base film, apply putty, paint and even paste wallpaper. Maybe you think we only need to choose the materials such as paint, wallpaper and wallpaper for the wall. In fact, it is not. In a good face, we need a qualified lining as the premise, because the lining is not handled well, and there will be various problems in a good face.

Close out completion

When your water, electricity, mud, wood and paint are finished, the basic decoration is coming to an end. Many netizens will ask, "we have acceptance at each stage. Why do we have to accept it at the end?" My answer is: "the final acceptance is the final insurance. When closing, you should find a professional third-party supervisor or someone with rich experience to check carefully and make the final money settlement after confirming that it is correct."